Riverdale Station Infrastructure Upgrade Project

Riverdale station infrastructure upgrade project

March 2024 - December 2026

Demand for electricity in Ottawa continues to grow and electricity needs in the community are increasing due to planned residential and commercial development. To ensure power is available for customers now and in the future in Old Ottawa East, we are upgrading our Riverdale Station. The project involves upgrading electricity infrastructure to increase capacity and replacing aging existing infrastructure.

What will this project include?

As part of the Riverdale Station Infrastructure Upgrade Project, we will:

  • construct a new building to house electricity infrastructure on the existing property at the intersection of Riverdale Avenue and Main Street;
  • install and connect new 13kV switchgear - a composition of electrical disconnect switches, fuses, and circuit breakers used to control, protect, and isolate electrical equipment - in the new building; and
  • install underground electricity infrastructure - specifically a new concrete encased duct - in the roadway.

Some of the existing trees on the property will need to be removed to accommodate the new building. All vegetation removal will be thoughtfully considered, along with mitigation measures. These measures could include tree planting or decorative community-friendly vegetation to help beautify the site after construction.

Riverdale site map

Please note: The new building illustration is not to scale. It will be smaller than depicted.

Why is this project important?

The Riverdale station, located at the intersection of Riverdale Avenue and Main Street, is a distribution station built in the 1940s. The station takes electricity from transmission lines at a higher voltage and converts it to the voltage required to supply power to the homes and businesses it serves.

These upgrades are important to ensure that we can continue to meet the capacity and reliability needs of the station’s service area.

Riverdale Station
Riverdale Station
Riverdale Station
Riverdale Station

How will this project benefit Hydro Ottawa customers?

Once the upgrades are complete, they will provide the neighbourhood - and overall Capital ward - with an increase in electricity supply to meet a growing demand and improve the overall reliability of our system.

The Riverdale Station Infrastructure Upgrade Project will support projected growth in electricity demand for the area and provide redundancy to our system in the event of outages or future extreme weather events. This project is one of many future-planning projects we are spearheading to make our electricity system as resilient, and as sustainable, as possible.

Resources from community information session

Contact

If you have questions about the project, or you would like to receive project updates, including information about upcoming community information sessions, please register to be part of our mailing list. Email us at [email protected]

Customer service representatives

FAQs

Was this page useful?
We'd like to hear from you