On September 4, 2024, Hydro Ottawa will be in your neighbourhood to perform planned work, which is necessary to maintain the reliability of the electrical distribution system in your area. In order to undertake this work safely, a planned power interruption will be required. Below are the details:

Affected street: Grenoble Crescent 

Project date: September 4, 2024

In case of postponement: September 5, 2024

Time: 7:00 a.m. to 3:00 p.m.

Contractor on site: Bradley Kelly Construction 