On September 14, 2023, Hydro Ottawa will be in your neighbourhood to perform planned work, which is necessary to maintain the reliability of the electrical distribution system in your area. In order to undertake this work safely, a planned power interruption will be required. Below are the details:
Affected streets: Butterfield Road, Caddy Court, Cove Court
Date: September 14, 2023
Planned power outage: 9:00 a.m. to 3:00 p.m.
Contractor on site: Asplundh Canada
Our qualified staff and contractors will conduct this work safely and efficiently, ensuring that any inconvenience is minimal.