On June 14, 2023, Hydro Ottawa will be in your neighborhood to perform planned work. In order to undertake this work safely, a planned power interruption will be required. 

Overall, this work will include:

  • the replacement of electrical infrastructure; 
  • road closures and lane reductions; and
  • tree trimming.

Streets: Dahlia Avenue, Kilborn Avenue, Niagara Drive and Blossom Drive

Date: June 14, 2023

Planned power outage: 8:00 a.m. to 4:00 p.m.

Contractors on site: K-Line Group of Companies, Lourenco and Bothello, Ottawa Crane, and Asplundh Canada

Our qualified staff and contractors will conduct this work safely and efficiently, ensuring that any inconvenience is minimal.

 